Formwork & Reinforcement
All projects include professional formwork, rebar or wire mesh installation, and precise elevation control to guarantee strength, consistency, and clean edges.
How we do it
The pour happens in a few hours; the formwork and reinforcement decide how it turns out. We set forms straight, braced and at the correct elevation, and place rebar or wire mesh on chairs so it ends up inside the concrete where it does its job.
Formwork and reinforcement are part of every concrete job we do, and we also take them on for builders and contractors who need forms set and steel placed for their own pour.
What's included
- Form layout and setting to finished elevation
- Bracing and staking for straight, clean edges
- Rebar cutting, bending, placing and tying
- Wire mesh placed on chairs at the correct depth
- Inspection-ready setup before the pour
- Form stripping after curing
How the job runs
The same five steps on every project, from the first visit to the final walkthrough.
- Step 01
Site visit
We walk the site with you, take measurements and talk through what you want built.
- Step 02
Written estimate
You get a clear, itemized estimate with no hidden fees before any work starts.
- Step 03
Scheduling
We agree on a start date and keep you updated if weather or inspections affect it.
- Step 04
The work
Our team preps, builds and cleans up, keeping you informed every step of the way.
- Step 05
Final walkthrough
We walk the finished job with you and back it with our 1-year workmanship warranty.
Common questions
Do you only do formwork for your own pours?
No. We also set forms and place reinforcement for builders and contractors.
Rebar or wire mesh — which do I need?
It depends on the load, the slab thickness and the plans. We recommend the right reinforcement for your project during the site visit.
Ready to build?
Tell us about your project and we'll reach out to schedule a visit.
Request a site visit
Mon–Sat10am–2pm
Thanks!
We received your request and will be in touch soon.